¼­ºñ½º¾È³» ȸ¿ø°¡ÀÔ È¸¿øÅ»Åð Áñ°Üã±âµî·Ï
Home Products Company Directory Trade ÇÑÁßÇÕÀÛ Áß±¹ÅõÀÚ
My ChemNet
   ÇöÀçÀ§Ä¡ : Home > Trade
¡¡
¿ÀÆÛ°Ô½ÃÆÇ
Offer to Buy
Offer to Sell







ÀÔ·ÂÀÏÀÚ: 2008-05-22

Á¦¸ñ: High-Ribbed Formwork, formwork for construction
  »óǰºÐ·ù: ¹«±âÈ­Çпø·á¿Í ±¤¹°
  µî·ÏºÐ·ù: Offer to Sell
  ³»¿ë: CAS NO: 0003
Price: 5USDMetric Tons
Payment: T/T

Additional_detail: Specifications Applications   Fast-EZ High-Ribbed Formwork, consisting of steel sheets formed into mesh and U pattern rib bone, will produce a surface with concrete which will bond directly to the next pour without any special treatment.    The formwork is widely used in building construction to form retaining walls, columns, stopends, construction joints and used to support slab flooring. Quality Approval British CP114 armoured concrete structure standards 1969 British 399 Chapter 1 standards on application of constant load and exerted load 1984 (CP3T Book 5 Chapter 1) Materials Fast-EZ High-Ribbed Formwork is manufactured from hot-dip zinc coated steel sheet to BS 2989 Z2 G275 standards. Manufacture   The mesh and ribs are formed on machines which first cut and press the mesh and then roll-form the ribs. At the same time the material is stretched to form an expanded mesh. Model: HR26G Thickness: 0.35MM Weight: 3.4KG/Sqm Size: 450MMx2500MM Features & Advantages Structure & Mechanism   Fast-EZ High-Ribbed Formwork will wedge its projections on the mesh into the concrete when it is poured in, and mechanical wedges thus are formed to bond adjacent cement blocks. The jointing quality is subject to strict control and the bonding and shearing strength are capable of matching to that of specially treated bonds.   1.Good mechanical performance and low side pressure   Fast-EZ High-Ribbed Formwork is only subject to 60% of side pressure compared with common formwork, thus enabling to decrease weight of rib bone by 40%. 2.Visual concrete pouring   Because it is comprised of porous open mesh, Fast-EZ High- Ribbed Formwork reduces the risk of voids and/or honeycombing occurring within the concrete. 3.Lightweight and convenience for transportation and installation  Fast-EZ High-Ribbed Formwork is only 10% as heavy as the common steel module, featuring fast installation and convenient transportation. 4.Optimizing technologies and increasing shearing strength   Fast-EZ High Ribbed Formwork will produce an ideal surface with high shearing strength combined with poured mortar that will penetrate into the formwork through the mesh pores. 5.Convenience for reinforced steel bar to go through and tie continuously   Fast-EZ High-Ribbed Formwork is of multiple pores and special mesh. It is easy to let reinforced steel bar 12mm below to go through the formwork just with little force. For reinforced steel bar with large diameter, it can go through by shearing the mesh. Besides, the formwork can be installed before tying the bars that can then penetrate into the form through the mesh. 6.Suitable for segmented concrete pouring   Fast-EZ High-Ribbed Formwork is a permanent one that is easy for concrete to bond with the next pour without dismantling the formwork or making a juncture, thus simplifying bonding work. 7. Easy for muff coupling and shearing   Fast-EZ High-Ribbed Formwork is multifunctional, easy to cut and bendable to form different shape to meet different requirements. Installation Fast-EZ High-Ribbed Formwork can be used combined with traditional frame. It is equivalent to 20mm plywood. It can be installed with the ribs placed horizontally or vertically, but support members should always be at right angles to the ribs. Ribs should be always face the side towards which concrete is poured in. Mesh is suitable to be cut with heavy scissor or grinder on the site. Adjacent sheets should jointed by overlapping the ribs by 150mm. End sheets are overlapped by 150mm over the supports.   Fast-EZ High-Ribbed Formwork can be used with all conventional support systems. To eliminate stripping of support, suitably formed rebar can be sued instead of conventional timber studs. Fastening to supports can be by nailing to timber or by wire tying to steel and rebar.   Adjacent sheets of high-ribbed formwork are joined by overlapping the ribs and tying the outer ribs at 150mm intervals. The rim of sheets should be overstepped by 150mm over the support.   Fast-EZ High-Ribbed Formwork can be installed with the ribs placed horizontally or vertically to meet different requirements. Support members should always be at right angles to the ribs to withstand the formwork. On-Site Operation Fast-EZ High-Ribbed Formwork is suitable for use with most grades of concrete including concrete pumping and plastic concrete. The slump should be between 70mm and 100mm although slumps up to 125mm can be used. In this situation the use of concrete vibrators in proximity to the high-ribbed formwork has to be limited in order to minimize grout loss. It is most suitable to pour the concrete much behind the formwork. In this way, it can not only decrease shock load and enable the concrete to be poured in the appropriate position but also produce high bonding quality. The formwork will be embedded in the concrete. To obtain suitable wedge surface, the formwork surface should be corrugated. Allow concrete to exude from the mesh of the formwork until a corrugated surface is formed. Application of vibrators can help speed up the flow of concrete up to the formwork. The vibrators should be at least 450mm away form the formwork, especially used for damped concrete. Excessive vibration should be avoided near the bonding of the concrete so as to ensure no voids and/or honeycomb occurring in the concrete. Meanwhile, it is also unallowable to let concrete flow down along the form surface. The water gathered on the surface during vibration should be quickly removed away, because it is easy to flush the ripple when flowing down. Generally, when it is hard to form the surface required, it is not because that the concrete is too wet but that it is too dry. So the possible reason is that you have not complied with the standard to mix the concrete. Due to continual product improvement, specifications are subject to change without prior notice.

¿¬¶ôó
´ã ´ç ÀÚ:
Hope Liu
ȸ»çÁÖ¼Ò:
Hanwang Road, Anping
ÀüÈ­¹øÈ£:
+86-0318-8066602
ÆÑ½º¹øÈ£:
+86-0318-8066601 
E - mail:
sales@jm-wiremesh.com

Copyright © 2003-2015 ChemNet.com All Right Reserved.