¿ÀÆÛ°Ô½ÃÆÇ |
|
|
|
|
|
|
Á¦¸ñ:
|
Metal anticorrosion fluorine silicon coating |
»óÇ°ºÐ·ù: |
µµ·á¿Í À×Å©
|
µî·ÏºÐ·ù: |
Offer to Sell |
³»¿ë: |
Additional_detail: Metal anticorrosion fluorine
silicon coating
1. Chemical composition and
characteristic
The metal anticorrosion fluorine
silicon coating is made of high
performance fluorine silicone
resin, IPN polymer, high quality
Pigment padding and special
Auxiliary medicinal preparation,
becomes through the polymer alloy
technology and the specialized
coating craft preparation.
* Bearing the chemical corrosion
and the electrochemistry
corrosion, resisting each kind of
strong corrosive medium ability;
* Attaching the strength between
varnish film level, high
reliability, preventing water,
oxygen and other corrosive medium
destructions;
* The anti- ultraviolet ray, the
heat resistance change ultra, the
coating maintenance lifetime is
lasting for five days;
* Is suitable for the poor
weather condition and each kind
of strong corrosion environment.
2. Range of application
Widely used in the petroleum
chemical industry, the
metallurgy, the electric power,
the transportation, the ships,
the mine, the building, the
submarine project, the thermal
energy coal gas, the machine
manufacture, the sewage treatment
and so on various domains.
Its May take each mechanical
device, the bridge, the skeleton,
trough pot, vessel, pipeline,
platform and outdoors marking and
so on, steel and iron, aluminum
material, stainless steel
corrosion preventing coating.
3. Physical property parametric
Color and outward appearance:
each kind of color according to
the color card; the coating is
toughness liquid, the varnish
film is smooth.
viscosity: ≥
50s / Solid content :≥55%
Fineness degree : ≤
60μm / Flashing point; :25℃
more
Surface dry up time : <1h/25℃
Full dry up time : ≤24h/25℃
(full solidity 7days )
Available period:
6h/25℃ / Hiding power:≤
160g/m2
Standard film thickness :40~60μm
(dry film )
4. Operation Guide
Removes by the painting rusty
stain, the old varnish film etc,
the basic plane request does not
have rusts away, greasy dirt,
oxide skin and so on unreliable
attachment; The steel and iron
surface may use spurts sand or
pill to eliminate the rust,
achieving the St3 level or the
Sa2.5 level is the best; If the
scene construction condition is
limited, eliminates oil rust by
steel wire brush and remover
processing together; Use special-
purpose cleansing agent to
eliminate the old paint level, in
order to guarantee the basic
plane satisfied the construction
request.
The painting environment dose not
has sand dust, sleet, mist;
maintenance basic plane clean is
dry, painting under room
temperature and clear weather.
using brushes spreads, spurts
spreads, rolls spreads or soaks
spreads method and so on when
spreads, according to the special
details to select the
corresponding method.
Elects evenly to brush
spreads/Spurts spreads the
primer, after waiting for the
primer table done, again paints
finishes. Each painting has the
time-gap request, the list
painting gap is 4 hours; If
needed adjusting the coating
viscosity, select the necessary
special-purpose diluents.
5. Package, Storage and
transportation
This packing in the iron bucket
in seal in which models; the
single package is 5kg, 10kg and
20kg.
This product should deposit
in cleanly, dry, cool,
ventilating place, avoids with
the acid and alkali contact,
prevent the rain drenches with
the insulation exposes to the
sun; the product storage time is
a year.
When transported, should add
grass rope, paper box or wooden
crate packing outside the iron
bucket, Avoid the force
collision, prevent the leakage.
This product is flammable,
strictly prohibits the smoke and
fire.
|
¿¬¶ôó |
´ã
´ç ÀÚ: |
elis |
ȸ»çÁÖ¼Ò: |
No.5 Century Boulevard,Handan,Hebei,CHINA |
ÀüȹøÈ£: |
86-310-7185888 |
Æѽº¹øÈ£:
|
86-310-7185999 |
E - mail: |
svchem27@yahoo.com.cn |
|